Operation

How to Apply Power to the System

1. Close (turn ON) the main circuit breaker of the power source supplying power to the InfraStruXure PDU.

2. Close (turn ON) the Main Input on the InfraStruXure PDU.

3. Power the PDU distribution circuit breakers:

a. Close (turn ON) the Main Output circuit breaker on the PDU.

After the Main Output circuit breaker has been closed (turned ON), both PDU distribution panels will be energized.

Note

150kW InfraStruXure PDU—Operation and Configuration

31