American Power Conversion PD150G6F, PD150L6F manual Operation, How to Apply Power to the System

Models: PD150L6F PD150G6F

1 84
Download 84 pages 32.8 Kb
Page 39
Image 39

Operation

How to Apply Power to the System

1. Close (turn ON) the main circuit breaker of the power source supplying power to the InfraStruXure PDU.

2. Close (turn ON) the Main Input on the InfraStruXure PDU.

3. Power the PDU distribution circuit breakers:

a. Close (turn ON) the Main Output circuit breaker on the PDU.

After the Main Output circuit breaker has been closed (turned ON), both PDU distribution panels will be energized.

Note

150kW InfraStruXure PDU—Operation and Configuration

31

Page 39
Image 39
American Power Conversion PD150G6F, PD150L6F manual Operation, How to Apply Power to the System