General
Information
Staging Second Compressor Off:
This diagram shows the sequence of operations where there is no longer a need to run the ‘Second’ compressor, so it is staged off. The ‘First’ and ‘Second’ compressor will be determined by the type of duplex start selected
Figure 10. CDHE/F/G sequence of operation: staging second compressor off
Satisfied Setpoint:
This diagram shows the sequence of operations where the setpoint has been satisfied, and the last compressor is staged off.
Figure 11. CDHE, CDHF and CDHG sequence of operation: normal shutdown to stopped and run inhibit
16 |