Manuals
/
American Standard
/
Kitchen Appliance
/
Water Dispenser
American Standard
CH530
manual
Control System Components
Models:
CH530
1
53
116
116
Download
116 pages
391 b
50
51
52
53
54
55
56
57
Module Characteristics
Power Up Diagram
Delay time 200 msec. Opens 2K1
Maintenance
Oil Supply System Problems
System Reset
Diagnostic Screen
Unit Start-Up Procedures
Control Settings Adjustments
Phase Loss Protection
Page 53
Image 53
Control System Components
CDHF-SVU01C-EN
53
Page 52
Page 54
Page 53
Image 53
Page 52
Page 54
Contents
X39640670030CDHF-SVU01C-EN
Read these carefully
Contents
Literature change
General Information
About this manual
Unit Nameplate
General Information
= 560 3 stage 935 2 stage Y = 500 3 stage 835 2 stage
Control Optional Packages
Commonly Used Acronyms
General Duplex unit components front view
Overview
General Duplex unit components 2 stage compressor
Compressor 1 or 2 2 Stage
Cooling Cycle
Pressure enthalpy curve 3 stage compressor
Pressure enthalpy curve 2 stage compressor
DynaView Human Interface
TechView Chiller Service Tool
Software Operation Overview Diagram
Power Up Diagram
Software States Figure
Timeline Text Figures
Staging Second Compressor On
CDHE/F/G sequence of operation auto to running
Satisfied Setpoint
Staging Second Compressor Off
CDHF/G sequence of operation lead 1/lag
CDHE/F/G sequence of operation lead 2 lag
Fixed Sequence Compressor 2 / Compressor
CDHF/G sequence of operation equalize starts and hours
Sequencing Balanced Starts and Hours
CDHF/G sequence of operation combined start
Simultaneous Compressor Start/ Stop
Restart Inhibit
Restart Inhibit Start to Start Time Setting
Restart Inhibit Free Starts
Clear Restart Inhibit
Oil and Refrigerant Pump
Surface Temperatures
Oil refrigerant pump circuit 1 or
20 100 percent RLA
Base Loading Control Algorithm
General Information
Sequence of operation ice making running to ice making
Ice Machine Control
Hot Water control
Unit Control Panel UCP
Unit Control Panel UCP
Control Panel Devices and Unit Mounted Devices
User-defined language support
Variable water flow through the evaporator
DynaView main processor
Operator Interface
Operator Interface
How It Works
Chiller Stop Prevention/Inhibit Feature
Top Level Mode Description
System Reset
Reference
Circuit Operating Mode
Chiller Operating Mode
Main Screen
Main Screen Data Fields Table
Diagnostic Screen
Back button provides navigation back to the chiller screen
Operator Interface
Reports
Report Menu
Report name Circuit Evaporator
Report name System Evaporator
Report name System Condenser
Report name Circuit Condenser
Report name System Ashrae Chiller Log
Historic Diagnostics Log
Header Screen
Setting Tab screens provides a user
Chiller
Feature Settings
Circuit Mode Overrides
System Mode Overrides
Display Settings
Purge
Operator Interface
Operator Interface
Operator Interface
Operator Interface
Operator Interface
Inter Processor Communications IPC3
Interprocessor Communication
IPC3 Definitions Bus Management
Binding
Control panel components layout
Control System Components
Control System Components
Control Panel Devices
Head Relief Request Output
Machine Shutdown Manual Reset MMR
Maximum Capacity Relay
Compressor Running Relay
Exop
Refrigerant Monitor Input 1A17
Epro Enhanced Protection
Trmm TRM4 Tracer Comm 4 interface
Cdrp Condenser Refrigerant Pressure Output
Cdrp Refrigerant Pressure Output Option 1A15
Temperature based
Condenser Pressure Output
Pressure based
Refrigerant Differential Pressure Indication Output
Percent RLA Output
Gbas Generic Building Automation System
External Chilled Water Setpoint Ecws
Module Characteristics
External Current Limit Setpoint
Wpsr WFC Water Pressure Sensing Option
1A14 Communication interface Module
1A8, 1A9, 1A11, 1A12 Quad Relay Output Status
1A13, 1A18, 1A19, 1A20 Dual Binary input module
Analog Input
Recommended Length to Run external Output signals
1A15, 1A16, 1A17, 1A21 Dual Analog Input/output Module
Unit mounted devices
Control System Components
Control System Components
UCP and Wye-Delta Starter Control Circuits
Control Sequence of Operation
Electrical Sequence
Delay time 200 msec. Opens 2K1
Control Sequence of Operation
Test and start timing sequence
Control Sequence Operation
AFD
Machine Protection Adaptive Control
Momentary Power Loss MPL Protection
Overload trip time versus percent RLA
Current Overload Protection
Reverse Rotation Protection
Phase Loss Protection
Current Limit Protection
Minimum and Maximum Capacity Limit
Differential to Start or Stop
SoftLoading
Evaporator Limit
Leaving Water Temperature Cutout
Head Relief Relay
Low Refrigerant Temperature Cutout
Cutout strategy
Condenser Limit
Restart Inhibit
High Vacuum Lockout
Oil Temperature Control
Outdoor Air Temperature
Controls Chilled Water Reset CWR
Maximum Reset
Return Water
Degrees of Reset
Values for start reset types
Constant Return
Equation
Outdoor air temperature versus degrees of reset
Reset Ratio
Reset function for return CWR
Reset Ratio = 50%
Return CWR
Daily Unit Start-Up
Unit Start-Up Procedures
Unit Startup
Toxic Hazards
Live Electrical Components
Seasonal Unit Start-Up
Mode
Unit Shutdown
Unit Shutdown Procedures
Oil Pump Heater Operation
Seasonal Unit Shutdown
Daily Maintenance and Checks
Periodic Maintenance
Moisture Contamination
Record Keeping Forms
Normal Chiller Operating Characteristics
Weekly Maintenance
Hazardous Voltage w/Capacitors
Every 3 Months
Annual Maintenance
Off-Season Maintenance
Oil Change Procedure
Oil Maintenance
Heater Damage
Compressor Oil Change
Replacing Oil Filter
Oil Filter Replacement
Oil Supply System Problems
Maintenance
Other Maintenance Requirements
Hazardous Voltage w/ Capacitors
Front View with Refrigerant Pump
Rotary valve in drain position
Refrigerant Charge
Contains Refrigerant
Leak Testing
Recovery and Recycle Connections
Cleaning the Condenser
Proper Water Treatment
Unit Corrosion Damage
Cleaning the Evaporator
Control Settings Adjustments
Unit Preparation
Purge System
103
104
105
106
107
108
109
110
111
112
113
114
115
Trane
Top
Page
Image
Contents