Periodic Maintenance

￿WARNING

Hazardous Voltage w/Capacitors!

Disconnect all electric power, including remote disconnects before servicing. Follow proper lockout/ tagout procedures to ensure the power cannot be inadvertently energized. For variable frequency drives or other energy storing components provided by Trane or others, refer to the appropriate manufacturer’s literature for allowable waiting periods for discharge of capacitors. Verify with an appropriate voltmeter that all capacitors have discharged. Failure to disconnect power and discharge capacitors before servicing could result in death or serious injury. Note: For additional information regarding the safe discharge of capacitors, see PROD-SVB06A-EN or PROD-SVB06A-FR

Weekly Maintenance

[ ] Complete all recommended daily maintenance procedures and checks. Complete logs on a daily basis.

Every 3 Months

[ ] Complete all recommended weekly maintenance procedures. Refer to the previous sections for details.

[ ] Clean all water strainers in the CenTraVac water piping system.

Every 6 Months

Normal Chiller Operating Characteristics

Operating Characteristic

Normal Reading

Approx. Evaporator Pressure

6 to 9 PSIA (-9 to -6 PSIG)

Approx. Condenser Pressure

17 TO 27 PSIA (2 to 12 PSIG)

(See Notes 1 and 2)

(Standard Condensers)

Oil Sump Temperature:

 

Unit Not Running

140°F to 145°F

 

(60°C to 63°C)

Unit Running

80°F to 162°F

 

(26.6°C to 72°C)

Differential Oil Pressure

18 to 22 psid