Remove the Front Panel

1.Use a coin or similar to turn the two black lock devices on either side of the display in the

direction of each other to a vertical position.

2. Push the front panel upwards and pull it outwards to disengage the locking device at the top of the enclosure.

3. Lift the front panel free of the two slots at the bottom of the enclosure.

Floor Anchoring

There are two floor anchoring options that can be used depending on the requirements in the installation area:

For stability: Reuse the L-shaped brackets that secured the enclosure to the pallet during shipment for a stand-alone UPS.

For seismic anchoring: Use a baying kit that includes U-shaped seismic anchoring brackets.

Note: Allow for enough working space behind the enclosure for electrical work to be carried out (e.g. if you want to install an XR Battery Enclosure at a later stage). Minimum rear clearance is 100 mm (3.93 in) and must comply with applicable national and local codes. 600 mm (23.6 in) is recommended.

Note: Hole positions are guidelines only.

990-1957C-001 MGE™ Galaxy™ 3500 10-30 kVA 208/220 V Single and Parallel Installation

9