Install the Baying Kit (Optional) for Interconnection of Enclosures and Seismic Anchoring

Caution: Baying kits are required in seismic areas.

1.Remove the side panels from the enclosure(s) to get access to the holes in the bottom frame.

Note: Make sure that the enclosures are level so that they can be anchored to each other.

2.Position two U-shaped floor anchoring brackets under one enclosure; one on each side.

Note: The U-shaped anchoring brackets are 1-2 mm higher than the opening below the enclosure to inactivate the casters. Therefore, the enclosure must be tilted when placing the U-shaped anchoring brackets under the enclosure.

990-1957C-001 MGE™ Galaxy™ 3500 10-30 kVA 208/220 V Single and Parallel Installation

13