UPS Units Apart without Conduits and Interconnection

1.Remove the front panel (not shown).

2.Loosen the two screws from the cable-inlet plates at the bottom plate of UPS 1 and UPS 2 and then remove the plates.

3.From UPS 1: Run the two PBus cables to the slots on the left side of the enclosure and down inside the panel.

4.From the lowest slot, fish out the cables from the side panel and run these down through the cable inlet and through the round hole at the bottom.

5.Run the PBus cables to UPS 2 and to the slots on the left side of the enclosure and up inside the panel.

6.Take out the PBus cables and leave these unattached to the parallel box.

7.Run the ABus cable from the maintenance bypass panel to the slots on the left side of the enclosure and up inside the panel the same way as for the PBus cables.

8.Reattach the cable-inlet covers.

9.Fasten the cables with cables ties.

38

MGE™ Galaxy™ 3500 10-30 kVA 208/220 V Single and Parallel Installation 990-1957C-001