1.In the UPS, feed the cable up through the conduit box or through the transparent cable route bracket (not shown).
2.Connect the BAT+,
3.Secure the cables to the perforated bracket with cable ties.
4.Equip the cable with conduits (if applicable).
5.In the XR Battery Enclosure, feed the cable up through the conduit box (if applicable) to the cable landing area.
6.Connect the (+) cable to busbar no. 1 (+), connect the N cable to busbar no. 4 (N), the
7.Secure the cable to the perforated bracket with cable ties.
8.Attach the top part of the conduit box (if applicable).
Connect Power Cables between Two XR Battery Enclosures
WARNING: Before carrying out the steps below, the system must be in total power off and the batteries must be removed.
WARNING: Each freestanding cabinet must be separately connected to the equipotential bonding system (protective earthing).
Note: The terminals are only suitable for connection of copper cables.
23 |