Install Seismic Option

Install the Seismic Battery Lock

Note: In seismic areas, dispose of the battery securing brackets that were used to secure the batteries during transport and use the seismic battery locks to secure the batteries.

Required parts:

• Four battery locks and 12 M5 screws for narrow battery enclosures.

• Six battery locks and 30 M5 screws for wide battery enclosures.

1. Place the battery lock below the battery row.

2. Secure the battery lock by the provided M5 screws.

Install the Seismic Stabilizing Brackets

Required parts:

• UPS, Battery Enclosure and Transformer

Eight 10 mm fittings

18 M6 nut washers

– One horizontal bracket

– Four stabilizing brackets

• Maintenance Bypass Panel (MBP)

Eight 2 mm fittings

18 M6 nut washers

One horizontal bracket

Four stabilizing brackets

42

MGE™ Galaxy™ 3500 10-30 kVA 208/220 V Single and Parallel Installation 990-1957C-001