Blower Testing

Step 5. Disconnect yellow wires from the pres- sure switch.

Yellow pressure

switch wires

Step 6. Reconnect wires from step 5 to new pressure switch.

Step 7. Reconnect tubing to new pressure switch.

Step 8. Carefully position pressure switch into blower housing.

Step 9. Position gas control power switch to the “ON” postion and verify proper heater operation.

Step 10. Replace control access cover form step 2.

Blower Testing

WARNING

115 volt potential exposure. Use caution making voltage checks to avoid

personal injury.

Step 1. Move the gas control power switch to the “ON” position and adjust control to call for heat.

Gas control power

switch

Step 2. Remove the three screws (Phillips screw driver) from the control access cover on the blower as- sembly and remove cover.

Control access

cover

Page 28

28

Page 28
Image 28
Bradford-White Corp U4TW40T*FRN, U4TW50T*FRN, U4TW60T*FRN service manual Blower Testing