5. Operation
5-2 . Operating procedure
NOTE:
Be sure to check the sewing pattern (refer to page 20) after setting has been completed to make sure that the needle drops down into the hole of the button.
| Preparation |
|
| Factory default | Variable range |
|
| Program No. | 00 * | 01 - 49 | |
| Turn on the power switch. |
| |||
|
|
|
|
| |
| (The POWER indicator q will illuminate and the pro- |
| 100 | 20 - 200 | |
| gram number will flash in the display window !44.) |
|
|
|
|
|
| 100 | 20 - 200 | ||
|
|
| |||
|
|
|
|
|
|
|
|
| Speed (rpm) | 2000 | 1,000 - 2,500 |
* For checking the origin points for X and Y feed
5-2-1 . Setting the program number
Determine the appropriate program from the program list which is given on pp. 3 - 5.
1 | Press the SELECT switch y |
until the PROGRAM NO. in- | |
| dicator illuminates. |
P PROGRAM NO.
SPEED
S E L E C T
COUNTER
2 Press the DISPLAY SET switches !2until the desired program number is flashing in the display window.
!2
3 | Depress the foot switch to the |
second step. |
* The display will stop flashing and illuminates steadily, and the feed mechanism will move to the sew- ing start position.
1st step 2nd step
This completes the setting of the program number.
5-2-2 . Setting the X-scale and Y-scale
1 | Press the SELECT switch y | |
until the | ||
| indicator illuminates. | |
| P PROGRAM NO. |
|
| y | |
|
| |
|
| |
| SPEED |
|
| COUNTER | S E L E C T |
|
|
2 Press the DISPLAY SET switches !2until the desired scale setting is flashing in the display window.
displayed as a percentage.)
!2
3 | Depress the foot switch to the |
second step. |
* The display will stop flashing and illuminates steadily, and the feed mechanism will move to the sew- ing start position.
1st step 2nd step
This completes the setting of the
5-2-3 . Setting the sewing speed
1 | Press the SELECT switch y |
until the SPEED indicator il- | |
| luminates. |
P PROGRAM NO.
SPEED
S E L E C T
COUNTER
2 Press the DISPLAY SET switches !2until the de- sired speed setting is flashing in the display window.
!2
26