3. Installation
3-9. Installing the liquid cooling tank, optional
1. Remove the rubber plug, and then push the liquid cooling tank q.
2. Tighten it with the set screw w.
3-10. Installing the vibrating bowl
1. Install the vibration bowl q with bolts w, spring wash- ers e, and washers r.
2. Pass the wires from the vibration bowl q through the hole in the table.
3-11. Installing the control box (for vibrating bowl)
1. Mount the control box q to the bottom of the box stay e with screws w.
2. Mount the control box stay e to the bottom of the work table with wood screws r.
12