Carrier 50EW, 50EY, 50EK installation instructions Ð Base Unit Dimensions, 50EJ/EK024-034

Models: 50EK 50EY 50EW 50EJ

1 56
Download 56 pages 61.69 Kb
Page 4
Image 4
Fig. 3 Ð Base Unit Dimensions, 50EJ/EK024-034

NOTES:

1. Weights include economizer (Std)

2. Manual background Center of gravity.

3. Do not locate adjacent units with dis- charge facing economizer inlet. Mini- mum clearances to be:

Adjacent Units: 15 -0

Top of Units: No overhang

Condenser Coil: 4 -0

Economizer Side: 6 -0

Filter Access Side: 10 -0 (for re- moval of evaporator coil)

4. For smaller service and operational clearances, contact Carrier Applica- tion Engineering department.

5. Bottom ducts designed to be attached to accessory roof curb. If unit is mounted on dunnage, it is recommended the ducts be supported by cross braces as done on accessory roof curb.

6. Dimensions are in inches. Dimen- sions in [ ] are in millimeters.

7. For units with electric heat, a ®eld- supplied 90° elbow must be installed in the supply ductwork below the unit discharge.

LEGEND

VFD Ð Variable Frequency Drive

UNIT SIZE

OPERATING

A

B

CORNER WEIGHT

WEIGHT

 

 

(lb)

 

50EJ/EK

 

 

 

 

 

(lb)

ft-in.

ft-in.

1

2

 

3

4

 

 

024

4016

5-113¤8

3-511¤16

823

914

1199

1080

028

4102

5- 81¤2

3-75¤8

844

859

 

1210

1189

030

4102

5- 81¤2

3-75¤8

844

859

 

1210

1189

034

4102

5- 81¤2

3-75¤8

844

859

 

1210

1189

Fig. 3 Ð Base Unit Dimensions, 50EJ/EK024-034

4

Page 4
Image 4
Carrier 50EW, 50EY, 50EK installation instructions Ð Base Unit Dimensions, 50EJ/EK024-034