3.When the machine is positioned on the trailer properly, lower the boom to the trailer deck.
4.Shut the engine off and remove the key.
5.Secure the unit to the transport vehicle with DOT (Department of Transportation) approved chains, binders (Items 1 and 2, Figure
NOTICE
•Never tow or pull the machine. Damage to the hydraulic motors could result.
•If the machine is totally
WARNING
When transporting the machine, make sure to use DOT approved chains and binders (Items 1 and 2, Figure
NOTICE
It is recommended to secure the machine through the tie downs (Item 3, Figure
located on each side of the machine framework.
When it becomes necessary to lift the machine:
1.Start the engine and fully raise the trencher boom, then shut off the engine.
2.Use a lifting device that can safely lift 3,000 lbs (1,361 Kg).
3.Use appropriate lifting chains (Item 1, Figure
4.Route the chains through the lifting eyes (Item 2, Figure
5.Route another lifting chain (Item 3, Figure
6.Connect all three lifting chains with the central lifting chain (Item 1, Figure
CAUTION
•Lift the machine approximately 12" to make sure that the machine is balanced before completing the lift.
7.Do a short test lift to make sure that the machine is lifted evenly. Adjust the lifting chains (Items 2 and 3, Figure