Routine Service and Maintenance
b.Place a solid object, such as a concrete block or 8" H x 8" W x 48" L piece of lumber, under the operator's platform.
c.Tilt the trencher boom downwards until the lowest cutting edge is touching the ground. See Figure
d.Continue to lower the boom assembly, pushing the front of the machine upwards. Continue raising the machine until the front drive sprocket and rear idler rollers are off the ground. Shut off the engine.
e.Measure the gap between the bottom of the center bogey guide roller (Item 1, Figure
f.If an adjustment is needed, remove the adjustment nut lock plate and rotate the tension adjustment nut (Item 2, Figure
g.With the tracks still off the ground, start the engine and rotate just the track being adjusted three or four times in both forward and reverse. Shut off the engine after rotating the track.
WARNING
DO NOT activate either the trencher operator presence control or trencher operation lever while testing the track assembly. This could cause an unstable condition on the machine.
i.Repeat the measurement and adjustment procedure on the other track assembly.
j.Lower the machine onto the ground.
1 |
2 |
1/4” - 3/8” |
2454 |
Figure