Cellboost 999-823 Pre-Start Inspection and Operation, 3-16, 17 Trencher Boom in Raised Position

Models: 999-823

1 88
Download 88 pages 11.3 Kb
Page 44
Image 44

Pre-Start Inspection and Operation

1

2441

Figure 3–17 Trencher Boom in Raised Position

3.Depress (step on) and hold the operator presence control (Item 1, Figure 3–18) in the “down” or activated position with your right foot.

1

2426

Figure 3–18 Trencher Boom in Raised Position

3-16

Page 44
Image 44
Cellboost 999-823 manual Pre-Start Inspection and Operation, 3-16, 17 Trencher Boom in Raised Position, 2441, 2426