Cellboost 999-823 manual Routine Service and Maintenance, 4-26, 22 Replacing Drive Sprocket

Models: 999-823

1 88
Download 88 pages 11.3 Kb
Page 74
Image 74

Routine Service and Maintenance

10.Install the spoils auger and secure it using the nut removed earlier.

11.Set the upper span of the chain into place on the trencher boom, and then wrap the chain around the roller at the end of the boom. Connect the chain together as shown in the “Chain Master Link” on page 28 for instructions.

12.Tighten the chain tension adjustment bolt until the proper chain tension is set according to the Adjusting Digging Chain Tension instructions shown earlier in this section.

 

 

 

 

 

 

1

 

 

 

 

 

2

 

 

 

 

 

4

 

3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6

 

5

 

16

 

 

 

7

8

9

 

 

 

 

 

 

 

 

15

 

 

 

 

 

10

 

 

 

 

 

 

 

 

 

14

 

 

8

 

 

 

 

 

13

12

 

11

2462

 

 

 

 

 

 

 

 

 

Figure 4–22 Replacing Drive Sprocket

4-26

Page 74
Image 74
Cellboost 999-823 manual Routine Service and Maintenance, 4-26, 22 Replacing Drive Sprocket