10
Rack-Mounting the Router in a 19-Inch 4-Post Rack
Use the following procedure to rack-mount the Cisco10008 chassis in a 19-inch 4-post rack:
Figure2 Attaching the Chassis to a 19-Inch 4-Post Rack
Warning
At least three people are required to mount the chassis in the equipment rack: two people are needed to hold the
chassis in place while a third person tightens the mounting screws.
Statement 234
Step1 Align the mounting bracket holes with the rack post holes. (The third person attaches the chassis to the rack.)
Step2 Insert the six mounting screws through the mounting bracket into the rack, and tighten the screws.
Go to the “Attaching the Cable-Management Bracket” section on page 16 to continue the installation process.
30010
13
240A
PROCESSOR ONLY
0B 5678
PROCESSOR ONLY
POWER
FAULT
MISWIRE
POWER
FAULT
MISWIRE
CISCO
10000
LINK
TX
RX
FAIL
GIGABIT ETHERNET
CISCO
10000
CARRIER
ALARM
LOOP
FAIL
CH OC-12-DSO SM-IR
CISCO
10000
CARRIER
ALARM
LOOP
FAIL
6XCT3–DS0
0
5
4
3
2
1
CISCO
10000
CARRIER
ALARM
LOOP
FAIL
6XCT3–DS0
0
5
4
3
2
1
FAIL
PERFORMANCE ROUTING ENGINE
CONSOLE
ST
A
TUS
ACO
CRITICAL
MINOR
MAJOR
ETHERNET
LINK
ACTIVITY
AUX
SLOT 0
SLOT 1
FAIL
PERFORMANCE ROUTING ENGINE
CONSOLE
ST
A
TUS
ACO
CRITICAL
MINOR
MAJOR
ETHERNET
LINK
ACTIVITY
AUX
SLOT 0
SLOT 1
CISCO
10000
CARRIER
ALARM
LOOP
FAIL
6XCT3–DS0
0
5
4
3
2
1
CISCO
10000
CARRIER
ALARM
LOOP
FAIL
6XCT3–DS0
0
5
4
3
2
1
CISCO
10000
CARRIER
ALARM
LOOP
FAIL
6XCT3–DS0
0
5
4
3
2
1
CISCO
10000
CARRIER
TX
RX
FAIL
OC–12/STM–4 POS SM–IR
FANS
OK
FAN
FAILURE
MULTI-
FAN
FAILURE
When hot swapping this fan tray,
removal and replacement must
be done in under two minutes or
system shutdown will occur.
CAUTION
CISCO
10000
CISCO
10000