Chapter 2 Switch Installation
Inserting and Removing the SFP Module Patch Cable
Figure 2-18 Removing a Bale Clasp Latch SFP Module
Step 5 Grasp the SFP module, and carefully remove it from the slot.
Step 6 Place the module in an
Inserting and Removing the SFP Module Patch Cable
Step 1 Attach an
Step 2 Insert the SFP module patch cable into the slot until you feel the connector on the cable snap into place at the rear of the slot (see Figure
Figure 2-19 Inserting an SFP Module Patch Cable
Step 3 Repeat these steps for the second switch that you want to connect to the first switch.
|
| Cisco CGS 2520 Hardware Installation Guide |
|
| |
|
|
| |||
|
|
|
| ||
|
|
|
|