Chapter 2 Switch Installation

Inserting and Removing the SFP Module Patch Cable

Figure 2-18 Removing a Bale Clasp Latch SFP Module

Step 5 Grasp the SFP module, and carefully remove it from the slot.

Step 6 Place the module in an anti-static bag or other protective environment.

Inserting and Removing the SFP Module Patch Cable

Step 1 Attach an ESD-preventive wrist strap to your wrist and to a bare metal surface.

Step 2 Insert the SFP module patch cable into the slot until you feel the connector on the cable snap into place at the rear of the slot (see Figure 2-19).

Figure 2-19 Inserting an SFP Module Patch Cable

Step 3 Repeat these steps for the second switch that you want to connect to the first switch.

 

 

Cisco CGS 2520 Hardware Installation Guide

 

 

 

 

 

 

OL-31444-01

 

 

2-21

 

 

 

 

 

Page 45
Image 45
Cisco Systems CGS 2520 manual Inserting and Removing the SFP Module Patch Cable, Removing a Bale Clasp Latch SFP Module