Chapter 2 Introduction to the SCE Platform
Back Panel
Cisco SCE 2000 4xGBE Installation and Configuration Guide
2-4 OL-7824-04
LED Groups Description
Mng The Mng port LEDs indicate the operational status of the SCE 2000 out-of-band
LAN-based management port, as follows:
Link/Active
Green — indicates that the port link is up
Unlit — indicates that the port link is down
10/100/1000
Steady green — indicates that the port is set to 100 Mbps
Unlit — indicates that the port is set to 10 Mbps
Orange — indicates that the port is set to 1000 Mbps
Back Panel
The SCE 2000 platform back-panel contains the following components:
Two field-replaceable power supply units with ON/OFF switches
A field-replaceable fan drawer
Ground connections
Two connectors to the external bypass module
The rear panels of both the AC- and DC-powered SCE 2000 platforms are shown in the following
pair of figures.
Figure 2-2: SCE 2000 Back Panel: AC Power