C H A P T E R 2

Installing the Server

This chapter describes how to install the server, and it includes the following sections:

Unpacking and Inspecting the Server, page 2-2

Preparing for Server Installation, page 2-3

Installing the Server In a Rack, page 2-5

Initial Server Setup, page 2-8

System BIOS and CIMC Firmware, page 2-12

Service DIP Switch, page 2-14

Note Before you install, operate, or service a server, review the Regulatory Compliance and Safety Information for Cisco UCS C-Series Servers for important safety information.

Warning IMPORTANT SAFETY INSTRUCTIONS

This warning symbol means danger. You are in a situation that could cause bodily injury. Before you work on any equipment, be aware of the hazards involved with electrical circuitry and be familiar with standard practices for preventing accidents. Use the statement number provided at the end of each warning to locate its translation in the translated safety warnings that accompanied this device.

Statement 1071

SAVE THESE INSTRUCTIONS

Cisco UCS C420 Server Installation and Service Guide

 

OL-27640-01

2-1

 

 

 

Page 19
Image 19
Cisco Systems UCS C420 manual Installing the Server, Statement