ClearOne comm AP10 Creating a G-Link network, Installation ~ Hardware Setup, three terminals in

Models: AP10

1 40
Download 40 pages 23.96 Kb
Page 12
Image 12
three terminals in

8

AB

Figure 2.2. AP10 rear panel connectors

The

three terminals in

the

Phoenix connector

correspond with the back- panel audio contacts (from left to right): +(positive), –(negative), and

(ground).

Installation ~ Hardware Setup

CD EF G

5. Wire the AP10 to the AP800 using the provided three-terminal Phoenix

push-on connectors. These connectors are designed for easy wiring; simply

insert the desired wire into the appropriate connector opening and tighten

down the top screw.

Transmit Input Audio connected to the Transmit Input [D] will be sent

 

down the telephone line.

Receive Output Audio from the telephone participant is passed to

+

￿

Ground

Negative

Receive Output [E].

Creating a G-Link network

1. Place the AP units in their proper locations. The back-panel G-Link In and

G-Link Out [B] connectors are designed for setting up your G-Link network.

G-Link connections between AP units are connected in daisy-chain fashion

Positive

Figure 2.3. Phoenix push-on connector

using category five twisted-pair cable.

2.The first ClearOne unit in the chain must have the G-Link In connector terminated with a G-Link terminator (provided).

AP800

AP 10

G-Link

G-Link

Terminator

 

AP 10

Audio: Transmit and Receive

 

G-Link

G-Link

 

Terminator

 

Figure 2.4. G-Link connection block diagram

3. The first ClearOne unit’s G-Link Out connector is then attached to the

 

G-Link In connector on the next unit in the chain. At the end of the network,

 

the final unit must have the G-Link Out connector terminated with a G-Link

 

terminator as well.

 

A G-Link network will allow interconnection of up to 16 AP10s and eight AP800s.

 

If the AP units are stacked vertically, connect them using the short RJ-45 jumper

 

(provided). If networking over longer distances (up to 20 feet/ 6.1 meters between

 

units), use Cat 5 twisted-pair (10BaseT LAN) cable.

Technical Services Group ~ 1-800-283-5936 (USA) ~ 1-801-974-3760

Page 12
Image 12
ClearOne comm AP10 Creating a G-Link network, Installation ~ Hardware Setup, three terminals in, ground, Cd Ef G