Chapter 3. Installation and Maintenance
3.6.4 Replacing the UPS
Proceed as follows to replace the UPS:
1.Ensure the UPS power switch is set to off.
2.Disconnect the shelf power cords from the rear receptacles on the UPS.
3.Disconnect the UPS power cord from the wall outlet.
4.Disconnect the serial control cable from the controller shelf.
5.Remove the screws that secure the front panel of the UPS to the cabinet.
6.Install the replacement UPS and replace the screws removed in step 5 to se- cure the unit.
7.Reconnect the power cords and the serial control cable.
8.Set the UPS output voltage level to your specific ac power source.
9.Set the UPS power switch to on, set the UPS
3.6.5 Replacing a Blower
WARNING
Only qualified service personnel should access the rear of the shelf to replace a blower.
The controller shelf has two blowers mounted on the rear. Connectors on the backplane provide the +12 Vdc to operate the blowers. When a blower fails, the shelf status (amber) LED on the power supply SBB is OFF and an error message is passed to the controller or host via the shelf status signal. The Device I/O as- sembly status LEDs indicate which blower has failed and then automatically switches the remaining blower to high speed. Refer to the SBB I/O Module User’s Guide (Part No.:
Use one of the following procedures to replace a blower (see Figure
CAUTIONS
The blowers are
Shelf air flow is lost when a blower is removed. Re- place immediately or damage can result.