RAID Array 3000 Controller Shelf

13.Connect a 5-meter SCSI cable (BN37A-05) between the host-inconnector on the Controller Shelf host 0 I/O module (bottom connector) and the corre- sponding connector on the host system.

14.Connect the maintenance serial control cable (17-04730-01) from the CTR 0 connector on the Controller Shelf host 0 I/O module to the corresponding connector on the maintenance PC.

15.Connect the UPS serial control cable (17-04729-01) from the UPS connector Controller Shelf host 0 I/O module to the like connector on the UPS.

16.Install jumper connector 12-49700-01 to the Controller Shelf UPS connector on the host 1 I/O module.

CAUTION

To prevent possible damage to the equipment, the input voltage level of the UPS must be set to your specific line voltage before proceeding. Refer to the UPS manual and set the input level to your ac power source(s).

17.After the UPS has been set to the correct input voltage level, set the low- battery warning option to five minutes (refer to UPS manual for instruc- tions).

18.This completes the Controller and Device Expansion Shelf cabling proce- dure. Dress and ty-wrap related cable groups, and then refer to the RAID Ar- ray 3000 Getting Started and Command Console Installation and User Guides for information describing how to setup and configure your subsys- tem.

3–26

EK–SMCPQ–UG. C01

Page 77
Image 77
Compaq manual RAID Array 3000 Controller Shelf