DES-3326S Layer 3 Fast Ethernet Switch User’s Guide

Switch LED Indicators

The LED indicators of the Switch include Power, Console, and Link/Act. The following shows the LED indicators for the Switch along with an explanation of each indicator.

Figure 3-12. The LED Indicators

Power This indicator on the front panel should be lit during the Power-On Self Test (POST). It will light green approximately 2 seconds after the switch is powered on to indicate the ready state of the device.

Console This indicator is lit green when the switch is being managed via out-of-band/local console management through the RS-232 console port using a straight-through serial cable.

Act/Link These indicators are located to the left and right of each port. They are lit when there is a secure connection (or link) to a device at any of the ports. The LEDs blink whenever there is reception or transmission (i.e. Activity--Act) of data occurring at a port.

Stacking Module LED Indicators

The switch’s current order in the switch stack is also displayed on the Stacking Module’s front panel under the STACK NO. heading:

Identifying External Components

37

Page 37
Image 37
D-Link DES-3326S manual Switch LED Indicators, Stacking Module LED Indicators