UPS Initial Startup

To start up the UPS:

1Verify that the internal batteries are connected.

2If an optional EBM is installed, verify that the EBM is connected to the UPS.

3Verify that the power input to the UPS has adequate upstream overcurrent protection:

Table 1. Minimum Upstream Circuit Breaker Rating

UPS Output Power

120V

208V

230V

2700W

30A

20A

16A

 

 

 

 

The power cord current ratings are listed in Table 2.

Table 2. Power Cord Ratings

Dell UPS Model and Voltage

Power Cord

Rating

Country

Supplied Cord Set

 

 

 

 

 

 

2700W

208V

L6-20P to C19

15A

North America

Yes

 

 

 

 

C19 to C20 Jumper

16A

North America

Optional

 

 

 

 

 

 

 

 

 

 

CEE 7/7 Schuko to C19

16A

Europe (Schuko)

Yes

 

 

 

 

 

 

 

 

BS 1363 to C19

13A

United Kingdom (New)

Yes

 

 

 

 

 

 

 

 

GB2009.1 to C19

16A

China

Yes

 

 

 

 

 

 

 

 

C19 to C20 Jumper

16A

Europe/Australia

Yes

 

 

 

 

 

 

 

 

C19 to C20 Jumper

16A

China

Yes

 

 

 

 

 

 

 

 

BS 546 to C19

15A

United Kingdom(Old)

Optional

 

 

 

 

 

 

 

 

TI16S3 to C19

16A

Thailand

Optional

 

 

 

 

 

 

2700W

230V

AS 3112 to C19

15A

Australia

Optional

 

 

 

 

 

 

 

 

IRAM2073 to C19

16A

Argentina

Optional

 

 

 

 

 

 

 

 

CEI 23-50 to C19

16A

Italy

Optional

 

 

 

 

 

 

 

 

KSC8305 to C19

15A

South Korea

Optional

 

 

 

 

 

 

 

 

IS 1293 to C19

16A

India

Optional

 

 

 

 

 

 

 

 

NBR 14136 to C19

16A

Brazil

Optional

 

 

 

 

 

 

 

 

C19 to C20 Jumper

16A

North America

Optional

 

 

 

 

 

 

 

 

L6-20P to C19

15A

North America

Optional

 

 

 

 

 

 

Installation 29

Page 29
Image 29
Dell 2700W manual UPS Initial Startup, Minimum Upstream Circuit Breaker Rating UPS Output Power, Power Cord Ratings