The learn cycle completes the following operations:

Discharges the battery to a predetermined threshold

Charges the battery back to full capacity

A learn cycle starts automatically when you install a new battery module. Learn cycles for batteries in both RAID controller modules in a duplex system occur simultaneously.

Learn cycles are scheduled to start automatically at regular intervals, at the same time and on the same day of the week. The interval between cycles is described in weeks.

Use the following guidelines to adjust the interval:

You can use the default interval.

You can run a learn cycle at any time.

You can set the learn cycle earlier than the currently scheduled time.

You cannot set the learn cycle to start more than seven days later than the currently scheduled time.

To change the battery settings perform these steps:

1In the AMW, select Storage ArrayChangeBattery Settings. The Battery Settings dialog opens.

2In Battery location, select a battery.

3Check these details about the battery:

Battery status

Battery age

Days until replacement

For more information, see the PowerVault Modular Disk Storage Manager online help topics.

Setting the Storage Array RAID Controller Module Clocks

You can use the Synchronize RAID Controller Module Clocks option to synchronize the storage array RAID controller module clocks with the storage management station. This option makes sure that the event timestamps

Configuration: About Your Storage Array

79

Page 79
Image 79
Dell MD3220, MD3200 owner manual Setting the Storage Array RAID Controller Module Clocks