VENTING INSTALLATION INSTRUCTIONS | 13 |
Installation Planning (Cont.) |
HORIZONTAL SYSTEM INSTALLATION USING TWO 90°
ELBOWS
The following configurations show the minimum vertical rise requirements for a horizontal system using two 90° elbows.
Venting with Two 90° Elbows
| Horizontal (H1) + | 90° Elbow |
Vertical (V) |
| |
Horizontal (H2) |
| |
8' min. | 9' max. |
|
9' min. | 11' max. |
|
10' min. | 13' max. |
|
12' min. | 17' max. |
|
14' min. | 20' max. |
|
Figure 24 - Horizontal Termination Configuration for Venting using Two 90° Elbows (Model (V)CD36T)
Venting with Three 90° Elbows |
| ||
Vertical (V) |
| Horizontal (H1) + |
|
Horizontal (H1) | Horizontal (H2) | 90° Elbow | |
5' min. | 2' max. | 6' max. |
|
6' min. | 3' max. | 8' max. |
|
7' min. | 4' max. | 10' max. |
|
8' min. | 5' max. | 12' max. |
|
12' min. | 8' max. | 20' max. |
|
20' max. | 8' max. | 20' max. |
|
Figure 25 - Horizontal Termination Configuration for Venting using Three 90° Elbows (Model (V)CD36T)
www.desatech.com |