Installation 21

in the concrete floor, the secondary anchor locations may be used. An optional cabinet isolation kit is available consisting of four anchor bushings and a base pad. If this kit is installed, place the pad on the floor and the bushings on the anchors, and position the cabinet on top.

Figure 3 - Anchoring the cabinet

600 mm

(23.56 po.)

SECONDARY LOCATION FOR FLOOR ANCHORS

PRIMARY LOCATION FOR FLOOR ANCHORS

520 mm

+ +

526mm

(20.68 po.)

(20.42 po.)

) .

mo m p

3 0 1

93

52 (.

Procedure 2 - Installing a rectifier in a cabinet

Step

Action

1Loosen and remove the screws securing the mounting brackets to each side of the rectifier.

2Reposition and secure the mounting brackets to the holes located nearest the front of the rectifier, on each side of the rectifier.

3Remove the blank panel from the cabinet and put the self tapping screws in a secure location, for future use.

continued

Emerson Energy Systems

Rectifier 200I/48NT5C05C Installation and User Manual

Page 21
Image 21
Emerson 200I/48-NT5C05C user manual Anchoring the cabinet, Procedure 2 Installing a rectifier in a cabinet Step Action