Power RequirementsHardware Preparation and Installation

Table 2-1 Environmental Requirements (continued)

Requirement

Operating

Non-Operating

 

 

 

Free Fall

 

1,200 mm (Packaged) /all

 

 

edges and corners

 

 

1.0m (Packaged) per ETSI

 

 

300 019-2-2 (Blade level

 

 

packaging)

 

 

25mm (unpackaged) per

 

 

GR-63-CORE

 

 

 

2.3.2Power Requirements

Table 2-2 Power Requirements

Requirement

Operating

 

 

Power supply

Provided by the server blade

 

 

Maximum power consumption

14.2 W

 

 

2.4Module Installation and Removal

Personal Injury

Power and communication cables

Touching power and communication cables that are energized may cause injuries. Make sure that the cables cannot be touched while the product is operating.

Damage of Circuits

Electrostatic discharge and incorrect installation and removal of the product can damage circuits or shorten their life.

Before touching the product or electronic components, make sure that your are working in an ESD-safe environment.

RTM-ATCA-7350 Installation and Use (6806800H30F)

19

Page 19
Image 19
Emerson RTM-ATCA-7350 manual Module Installation and Removal, Power Requirements