Emerson VSM, VSR, VSS service manual Pre Start-Up Checklists

Models: VSR

1 145
Download 145 pages 51.02 Kb
Page 52
Image 52
Pre Start-Up Checklists

Pre Start-Up Checklists

The following checklists are to help prepare the equipment before the Vilter Technician arrives at the jobsite. Vilter recommends that a Trained Technician go through the following tasks. The operating Manuals provided by Vilter, can be referenced for any type of questions or special instructions.

Every Refrigeration unit includes a Vilter Start-Up (Confirm on PO). The following tasks are not included in the Vilter Start-up provided in your equipment purchase. Any tasks below that are done by the Vilter Technician will take away from the pre-determined time that was provided with the equipment pur- chase. Vilter suggests that the Vilter Technician’s time be used during the start-up of the System and not for the below System Preparation.

Note: Each item below MUST be “Checked-Off”, Signed and Returned to the Vilter Service Department. Failure to do so will “Null & Void” future Warranty considerations.

52

Page 52
Image 52
Emerson VSM, VSR, VSS service manual Pre Start-Up Checklists