Using LANVIEW

Table 4-1 LANVIEW LED Diagnostic Indications (continued)

 

 

 

 

 

 

LED

Color

State

Recommended Action

 

 

 

 

 

UP

Off

No valid connection to switch stack down

1.

Make sure the switch connected to

 

 

connector.

 

the stack down connector is

 

 

 

 

powered on.

 

 

 

2.

Replace cable with a known good

 

 

 

 

one.

 

 

 

3.

If the problem still exists, contact

 

 

 

 

Enterasys Networks for technical

 

 

 

 

support.

 

 

 

 

 

Green

Solid. Valid connection to switch stack down

None.

 

 

connector.

 

 

 

 

Blinking. Information is being transferred

 

 

 

 

through the high-speed stacking cable.

 

 

 

 

 

 

Manager

Off

Switch is operating as a Member in the stack.

None.

 

 

 

 

 

Green

Solid. Switch is operating as the Manager of the

None.

 

 

stack.

 

 

 

 

 

 

RPS

Off

RPS not in use.

None.

 

 

 

 

 

Amber

Solid. The switch internal power supply failed,

If an RPS is connected to the switch and

 

 

and the RPS is providing the proper power to

should be providing power, perform the

 

 

the switch.

following:

 

 

 

1.

Ensure the RPS is powered on.

 

 

 

2.

Ensure that the AC power cord to

 

 

 

 

the RPS is plugged in correctly and

 

 

 

 

that there is power at the AC power

 

 

 

 

source.

 

 

 

3.

Replace the power cord with a

 

 

 

 

known good one.

 

 

 

4.

Ensure the DC power cord from the

 

 

 

 

RPS to the switch is plugged in

 

 

 

 

correctly.

 

 

 

5.

If the problem persists, contact

 

 

 

 

Enterasys Networks for technical

 

 

 

 

support.

 

 

 

 

 

SecureStack C2 Installation Guide 4-5

Page 67
Image 67
Enterasys Networks C2H124-48P, C2G124-48P manual Rps