Numerics
1000BASE-FX network connections requirements for 2-2
1000BASE-T requirements for 2-3
100BASE-T requirements 2-2
10BASE-T connection 3-21requirements 2-2
A
AC input specifications A-2AC Power
connecting to 3-15
C
C2G124-48P Stackable Switch introduction to 1-2
C2H124-48P Stackable Switch introduction to 1-3
Cable
Fiber Budget A-3Cable specifications
1000BASE-FX network 2-21000BASE-T network 2-3100BASE-T network 2-210BASE-T network 2-2
Cables
high-speed stacking 3-10CLI commands
introduction to 1-7Connecting to the network 3-21Connectivity
introduction to 1-6Console port
pinout assignments A-7
D
Document conventions xvii
E
Electromagnetic Compatibility (EMC)
requirements A-7
Enterasys
contacting 1-7
F
Fiber budget A-3
Index
Front panel 1-3, 1-4
H
High-Speed Stack connections introduction to 1-4
High-speed stacking cables installation of 3-10
I Installation
connecting to the network 3-21high-speed stacking cables 3-10in a rack 3-9
new stack 3-13
new switch in existing stack 3-14optional Mini-GBIC 3-3
Installation site
what is needed at the 3-8
L
LANVIEW Diagnostic LEDs
introduction to 1-7
LANVIEW LEDs 4-2
Link LEDs
viewing of 4-2
Local Management
introduction to 1-6
M
Management use of 1-6
MGBIC-02 specifications for A-6
MGBIC-08 specifications for A-6
MGBIC-LC01 specifications for A-4
MGBIC-LC03 specifications for A-4
MGBIC-LC09 specifications for A-5
MGBIC-MT01 specifications for A-4
Mini-GBIC installation of 3-3removal of 3-6
Mini-GBIC input/outputs specifications for A-3