
CHAPTER 7 Power ON and OFF of the partition
7.1 Related to the power ON and OFF of the partition
CHAPTER 7 Power ON and OFF of the partition
7.1Related to the power ON and OFF of the partition
The power ON and OFF of the partition is described.
-7.1.1 Power ON of the partition
-7.1.2 Power OFF of the partition
Further, the power ON and OFF of the partition can be operated by a Partition Operator account with Administrator or Operator privileges for the partition.
All the screenshots are display examples and the contents displayed by the system configuration are different.
7.1.1Power ON of the partition
The procedure of power ON of the partition is explained.
Operations
1.
[MMB
2.Click [Partition] – [Power Control].
[Power Control] window is displayed. For details about the [Power Control] window, see “1.3.1 [Power Control] window” of PRIMEQUEST 2000 series Tool Reference
108