CHAPTER 2 Preparing for Main Unit Installation 2.8 Mounting the Main Unit in a
Note
If you also purchased optional modules for installation, such as additional memory modules or PCI Express cards, first confirm that the main unit functions normally before mounting the optional modules in the main unit.
2.8Mounting the Main Unit in aThe PRIMEQUEST2000 series server is mounted for use in a
This section describes how to connect the power cables.
You need to connect the power cables to outlets with ground terminals.
Remark
The main unit and PCI_Box are designed to operate with a power supply facility that supports grounded wiring. Do not connect the main unit and PCI_Box to a power supply facility that does not provide grounded wiring. To determine the type of power supply in your building, contact the building manager or a qualified electrician.
Operations
1.Confirm with an engineer specializing in electricity that the input power satisfies power requirements. For details on the power requirements, see 1.3 Installation Specifications in the PRIMEQUEST2000 Series Hardware Installation Manual
2.Confirm that the power cables are connected to the AC inlets of the main unit and PCI_Box. Also confirm that the power cables are secured with the AC cord clamps for the AC inlets on the main unit.
-The cable is passed through the circle of release Thailand.
-Release tie is tightened and the power cable is fixed. The insulation connector is mistaken from the server and does not come off.
Remark
6