CHAPTER 7 Power ON and OFF of the partition

7.1Related to the power ON and OFF of the partition

3.Select [Power On] for the [Power Control] of the partition number to which power is to be supplied and click the [Apply] button.

4.The dialog box for confirmation is displayed. Click [OK] button to continue the operation and [Cancel] button to cancel the operation.

Remark

-The warning is displayed when ‘power is already supplied to the partition’ and when ‘the control specified for power cut off was failed’.

-After cutting the power of all the partitions, it cannot be supplied for some time.

7.1.2Power OFF of the partition

The procedure of power OFF of the partition is explained.

In Windows, when the system is to be shut down from MMB Web-UI, SV Agent (ServerView Agent) is necessary. For the method of setting the SV Agent, see the description of “System shut down” tab of the ServerView Operations Manager Installation ServerView Agents for Windows.

In case of the below-mentioned status, see “11.2.10 Troubles while partition operations” of PRIMEQUEST 2000 Series Administration Manual (C122-E175EN) and confirm the contents.

-The MMB Web-UI displays [Error] for [Status] (information area) because either of the following was executed:

-[Power Off], [Reset] or [Force Power Off] of the partition

-Shutdown from the operating system

-“Read Error” is displayed for Part Number, Serial Number if the status of each component is displayed on the [MMB Web-UI] window.

Operations

1.Log in to MMB Web-UI.

The [MMB Web-UI] window is displayed.

2.Click [Partition] – [Power Control] from the MMB menu.

[Power Control] window is displayed. [#] column is partition number. For details on [Power Control] window, see [1.3.1

[Power Control] window” of PRIMEQUEST 2000 series Tool Reference (C122-E177EN).

FIGURE 7.2 Example of [Power Control] window