1. MOUNTING

1.Calculate necessary length of main shaft from the length of retraction tank Lt and cut off the unnecessary portion.

Supplied length: 2.2 m or 3.8 m

Lt + 200 mm for 400 mm travel

Lt + 50 mm for 250 mm travel

 

 

 

 

 

Take care

Chamfer the edge to

 

not to damage.

protect O-ring from

 

 

damage.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2.Remove hex bolt, nut, spring washers, flat washers and trunnion pins from the main body flange. Then, mount the raise/lower drive unit on the shaft sleeve by using the hardware removed.

 

 

 

G

 

 

 

IN

 

 

N

 

R

 

A

 

 

W

 

 

 

WA

RN

ING

 

 

Raise/lower drive unit

Flat Nut washer

Hex. bolt

Flange assembly

(M10X30)

 

Spring washer

Flat washer

Trunnion pin

Shaft sleeve and raise/lower drive unit assembly

3. Pass the transducer cable through the main shaft.

1-11

Page 19
Image 19
Furuno CH300 manual Trunnion pin, Shaft sleeve and raise/lower drive unit assembly