1.MOUNTING

11.Align the bow mark on the soundome with the bow mark on the flange assembly, and then fix the main shaft with and shaft retainer.

12.Fix the jubilee clip to the main shaft.

Shaft retainer

15 mm

1-2 mm

Hex. bolt

Jubilee Clip Main shaft

Note: Attach the shaft retainer so it is 15 mm from the top of the shaft. The soundome is then placed 10 mm above the bottom of tank when retracted.

13.Insert grease cotton (supplied with flange assembly), and fix them with the cotton retainer as follows.

a)Wind grease cotton onto main shaft.

b)Mark on the cotton as below.

c)Remove the cotton from the shaft, and then cut it at the position of the mark. Discard the ends.

d)Wind cottons as shown below.

e)Push cottons into the flange assembly.

14.Tighten the grease cotton retainer.

Wind grease cotton onto main shaft and cut it as shown below.

Space joints of grease cotton 120apart and push them into body flange.

Spring washer

Cotton retainer

Installing grease cotton on the main shaft

15.Fasten the pipe cap (supplied) to main shaft.

16.Unscrew 10 pcs of M5X35 socket head cap screws with soundome fixing tool to dismount soundome.

17.Remove and discard the protection sponge placed in soundome.

1-16

Page 24
Image 24
Furuno CH300 manual Installing grease cotton on the main shaft