Chapter 2. Mechanical Installation
Mechanical Installation Checklist

Before operating the ultraviolet lamp system for the first time, be sure the following procedures have been completed.

Table 3. Mechanical Installation Checklist

Item

Chapter

 

 

† Review safety procedures

Chapter 1, “Safety”

 

 

† Light shields in place

“UV Light Shielding” on page 34

 

 

† RF detector positioned correctly

“RF Detector Mounting” on page 35

 

 

† Fan connection for exhaust of light shield

“Remote Blowers” on page 36

 

 

† RF screen and lamp bulb inspected

Introduction, page 11

 

 

This chapter describes the physical installation of the F300S/F300SQ Fusion UV Lamp System. Directions regarding mounting and shielding of the system are somewhat general because they will vary depending upon the details of each individual installation.

Unpacking and Inspection

This Fusion UV lamp system has been thoroughly tested inspected, and packed prior to shipment. Before unpacking, examine all shipping containers for damage. After unpacking, examine the equipment for damage. Any damage should be reported immediately to the shipper and to Fusion UV Systems Incorporated. A delay of more than 10 days may invalidate future claims for damages.

CAUTION: Irradiators are particularly vulnerable to dust, dirt, metal chips, and RF screen damage. They are shipped with a protective covering over the screen. The covering should not be removed until just prior to installation.

When unpacking, identify and compare each item with the packing list enclosed. Remember to examine each component for damage. Appendix E, “Replacement Parts” details the items included with the system which will be required to complete the installation.