Chapter 3. Electrical System

This chapter discusses the electrical installation and electrical setup aspects of the F300S/F300SQ Ultraviolet Lamp System.

Electrical Installation/Setup Checklist

Before operating the ultraviolet lamp system for the first time, be sure the following items have been reviewed and/or tested.

Table 4. Electrical Installation and Setup Checklist

Item

Chapter

 

 

† AC input voltage matches equipment label and

Chapter 3, “Electrical System”

connected correctly

 

 

 

† Power supply HV capacitors tapped for AC line

Chapter 3, “Electrical System”,

frequency

page 51

 

 

† Power supply HV transformers correctly tapped for AC

Chapter 3, “Electrical System”,

input voltage

page 51

 

 

† Programming correct for each unit

Chapter 3, “Electrical System”,

 

page 43, page 44

 

 

† Interconnection cables secure

Chapter 3, “Electrical System”,

 

page 44, page 49

 

 

† RF cable secure

Chapter 3, “Electrical System”,

 

page 45, page 49

 

 

† User inputs (EXTERNAL INTERLOCK, SYSTEM

Chapter 3, “Electrical System”,

BLOWER) connected if wanted

page 40

 

 

† Remote inputs (RESET, LAMP ON) connected if

Chapter 3, “Electrical System”,

wanted

page 45

 

 

† User outputs (FILAMENT ON, HV ON, FUTURE USE,

Chapter 3, “Electrical System”,

LAMP ON, and PRESS ENABLE) connected if wanted

page 46

 

 

† Review normal operating procedures

Chapter 4., Operation, on page 55

 

 

Accessory Parts List

The Accessory Parts List is located in Appendix E, “Replacement Parts,” and should be reviewed when setting up your system.

Installation, Operation, and Maintenance Manual # 509252 Rev R

39