3.Press the LAMP ON switch: the green LAMP ON indicator blinks, then stays lit.

4.Check the line currents. The line currents should conform to the values in Table 11.

Table 11. P300M/P300MQ/P300MT Current Requirements

System Line

Line Currents (A)

 

 

Voltage

with K300M

without K300M

Single Phase

Modular Blower

Modular Blower

 

 

 

 

200

15

14.5

 

 

 

208

14

13.5

 

 

 

220

14

13

 

 

 

230

13.5

13

 

 

 

240

13.5

12

 

 

 

5.Check RF detector and customer use interlocks as described in Chapter 5, “Troubleshooting.”

Initial Startup Procedure, Multiple-Unit Systems

1.Turn POWER switches of all units to ON.

2.Press the LAMP OFF/RESET switch of the Master.

3.Press the LAMP ON switch of all slaves.

4.Press LAMP ON switch of the Master.

NOTE: Front panel controls take precedence over remote or master commands.

Master/Slave Operation

One master power supply can control up to five slave units. Review Chapter 2, “Mechanical Installation” to understand the interconnections and programming needed.

Operating the System

1.Turn POWER switches of all units to ON.

2.Press the LAMP OFF/RESET switch of the Master.

3.Press the LAMP ON switch of all slaves.

Installation, Operation, and Maintenance Manual # 509252 Rev R

57