4.Place the button board onto the upper cover and replace the two screws.

Screw List

Step

Screw

Quantity

Screw Type

 

 

 

 

Button Board

M2*3

2

 

Assembly

 

 

 

 

 

 

 

5.Connect and lock the touch pad FCC to the button board.

108

Chapter 3

Page 118
Image 118
Gateway EC14 manual Chapter