1. Press the

button. Press

(enter twice) to bypass the other screens.

2. Press the

button.

3. Press the

button to adjust the settings.

4. Press the

button to accept the changes.

Unload Delay

The unload delay is used to control the amount of time the unload auger runs after the metering rolls stop to allow the unload auger to clean itself out.

To change the setting of this delay follow these instructions:

1.Press the button. Press (enter three times) to bypass the other screens.

2.Press the button.

3.

Press the

button to adjust the settings.

4.

Press the

button to accept the changes.

PNEG-951

39

Page 39
Image 39
GSI Outdoors PNEG-951 manual Unload Delay