39PNEG-951
1. Press thebutton. Press(enter twice) to bypass the other screens.
2. Press thebutton.
3. Press thebutton to adjust the settings.
4. Press thebutton to accept the changes.
Unload Delay
The unload delay is used to control the amount of time the unload auger runs after the metering rolls stop to
allow the unload auger to clean itself out.
To change the setting of this delay follow these instructions:
1.Press thebutton. Press(enter three times) to bypass
the other screens.
2.Press thebutton.
3.Press thebutton to adjust the settings.
4. Press thebutton to accept the changes.