Handspring 300 From the Day View, press Menu, Tap the circle to the right or left of the event

Models: 300

1 286
Download 286 pages 47.34 Kb
Page 135
Image 135

Event conflict

Working with floating events

Application 6 Tasks

Date Book Plus can include events that are a combination of a To Do item and a Date Book event. These events are called “floating events.” Floating events are not assigned to a specific date, but can still be timed or untimed, can have alarms, and can repeat. If a floating event is not completed by midnight, it automatically advances to the next day until you mark it complete.

You can distinguish a floating event from an integrated To Do item by the circle that appears next to the floating event (in place of the To Do item priority number and check box). Floating events appear in alphabetical order at the top of the Day View screen between any integrated To Do items and untimed events.

To create a floating event:

1.From the Day View, press Menu .

2.Under Record, select New Floating Event.

3.Enter a description of the event.

4.Tap a blank area on the screen to deselect the floating event.

To mark a floating event complete:

Tap the circle to the right or left of the event.

Tips for using floating events:

To prioritize floating events, enter a number followed by a space or dash as the first few characters of the description.

Section 6

Application-Specific Tasks 127

Page 135
Image 135
Handspring 300 manual From the Day View, press Menu, Tap the circle to the right or left of the event