Heat & Glo LifeStyle SL-950TV-IPI-D Termination Locations, A. Vent Termination Minimum Clearances

Models: SL-750TV-D SL-950TV-IPI-D SL-550TV-D SL-550TV-IPI-D SL-750TV-IPI-D SL-950TV-D

1 54
Download 54 pages 51.66 Kb
Page 12
Image 12
4 Termination Locations

4 Termination Locations

A. Vent Termination Minimum Clearances

A. Vent Termination Minimum Clearances WARNING

Fire Risk. Explosion Risk.

Maintain vent clearance to combustibles as specified.

Do not pack air space with insulation or other materials.

Failure to keep insulation or other materials away from vent pipe may cause fire.

8 FEET

VERTICAL

 

WALL

LOWEST

 

DISCHARGE

 

OPENING

 

TERMINATION

 

CAP

 

 

X

 

12

 

ROOF PITCH

 

IS X/ 12

H (MIN.) - MINIMUM HEIGHT FROM ROOF

TO LOWEST DISCHARGE OPENING

Roof Pitch

H (Min.) Ft.

Flat to 6/12

1.0*

Over 6/12 to 7/12

1.25*

Over 7/12 to 8/12

1.5*

Over 8/12 to 9/12

2.0*

Over 9/12 to 10/12

2.5*

Over 10/12 to 11/12

3.25

Over 11/12 to 12/12

4.0

Over 12/12 to 14/12

5.0

Over 14/12 to 16/12

6.0

Over 16/12 to 18/12

7.0

Over 18/12 to 20/12

7.5

Over 20/12 to 21/12

8.0

* 3 foot minimum in snow regions

Figure 4.1 Minimum Height from Roof to Lowest Discharge Opening

Figure 4.1 specifies minimum vent heights for various pitched roofs.

 

 

 

 

GAS OR WOOD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TERMINATION

 

 

8 FEET

 

 

 

 

 

 

 

 

 

 

 

(MINIMUM) TO

 

 

 

 

 

 

 

 

 

 

 

PERPENDICULAR

 

 

 

 

 

GAS

 

 

 

WALL (GAS ONLY)

18 IN. TERMINATION

 

 

 

 

 

 

 

 

 

 

 

A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Termination Clearances

 

Gas

Wood

A

6 inches

20 inches

Figure 4.2 Multiple Vertical Termination

12

Heat & Glo • SL-550 / 750 / 950TV-D2053-985 Rev. J • 4/07

Page 12
Image 12
Heat & Glo LifeStyle SL-950TV-IPI-D, SL-950TV-D, SL-550TV-D Termination Locations, A. Vent Termination Minimum Clearances