Holder C 9700 Maintenance during the First Period of Operation, Check the Engine for Leaks

Models: A4 VG 40 EP A6 VM 55 EP C 9700 C 9700 H C 9.72 C 9.78 H C 9800 H C 9.83 H C 9.72 H C 9.88 H VG 50 EP

1 221
Download 221 pages 26.52 Kb
Page 162
Image 162
Maintenance during the First Period of Operation

C 9700 ... C 9.88 H

Operating Instructions

Maintenance during the First Period of Operation

During the first period of operation the following services and inspections are due:

Maintenance after the First 50 Operating Hours Maintenance after the First 150 Operating Hours Maintenance after the First 500 Operating Hours

Maintenance after the First 50 Operating Hours

Check the Engine for Leaks

-Raise the dump body (loading platform*) and secure against accidental lowering.

-Check the engine and implements for leaks.

Carry out the other services in accordance with the maintenance schedule. You can find the description of the services in the maintenance schedule page reference or in the alphabetical index.

* Option

145 052

161

Page 162
Image 162
Holder C 9700, VG 50 EP Maintenance during the First Period of Operation, Maintenance after the First 50 Operating Hours