Holder C 9.72 Maintenance Every 500 Service Hours, Checking the Heating System, Bild160, Bild045

Models: A4 VG 40 EP A6 VM 55 EP C 9700 C 9700 H C 9.72 C 9.78 H C 9800 H C 9.83 H C 9.72 H C 9.88 H VG 50 EP

1 221
Download 221 pages 26.52 Kb
Page 182
Image 182
Maintenance Every 500 Service Hours

C 9700 ... C 9.88 H

Operating Instructions

Maintenance Every 500 Service Hours

 

Checking the Heating System

1

- Set the heat shut-off valve lever (1) down to the "OFF" position.

-Run the engine warm.

-Set the heat shut-off valve lever (1) up to the "ON" position.

Bild_160

- Set the heating blower switch (2) to stage 2. Warm air

2

should flow out of the legroom heating nozzles.

 

Bild_045

145 052

181

Page 182
Image 182
Holder C 9.72 Maintenance Every 500 Service Hours, Checking the Heating System, C 9700 ... C 9.88 H, Bild160, Bild045