Honeywell EN2H-0221GE51 R0808 service manual Switching time programming program P2 and P3 enabled

Models: EN2H-0221GE51 R0808

1 258
Download 258 pages 27.36 Kb
Page 61
Image 61

SDC / DHC

Operation

 

 

Switching time programming (program P2 and P3 enabled)

Upon accessing the menu-selection level, the "Timeprograms" menu always appears first. Enabling of programs P2 and P3 in the "System Parameters" menu (see 5.2 Menu-selection level, pg. 48 ).

Select heating circuit:

Select program:

HC

P1

MC -1

P2

MC -2

P3

DHW

Default Copy

time circuit

Select day and cycle:

Change:

Change:

Change:

Mo-

Hcy-1

Start of heating

End of heating

Temperature

Mo-

Hcy-2

Monitoring

 

 

 

We

 

 

 

 

Mo-

Tu-

Su-

 

 

 

Th

 

 

Copy day

Hcy-3

Hcy-1

 

Fr

 

Hcy-3

 

 

 

 

 

 

 

 

Sa

 

 

 

 

 

 

 

 

 

Only appears if there are switching times in the second heating cycle

Return: 3 s

Return to the basic display:

HC

Direct heating circuit

MC-1 Mixed heating circuit 1

MC-2 Mixed heating circuit 2

DHW

Hot-water heating circuit

Hcy

Heating cycle

EN2H-0221GE51 R0808

61

Page 61
Image 61
Honeywell EN2H-0221GE51 R0808 service manual Switching time programming program P2 and P3 enabled