Hoshizaki MWH KML-451MAH aFactory Line Set Installation, 1Factory Line Set Modification

Models: MWH KML-351MAH KML-250MAH MWH KML-631MAH MWH MRH MWH KML-451MAH

1 40
Download 40 pages 33.48 Kb
Page 26
Image 26
5. Line Set Installation

5. Line Set Installation

Precharged factory line sets, available as optional equipment from Hoshizaki America, are recommended. For details, see "II.G.5.a) Factory Line Set Installation." Field fabricated line sets are allowed. For details, see "II.G.5.b) Field Fabricated Line Set Installation."

a)Factory Line Set Installation

1)Route the factory line set (see "II.G.4 Line Set Size and Refrigerant Charge" for details) from the remote condenser unit to the icemaker. Leave a service loop behind the icemaker to allow the icemaker to be pulled out for service. See Fig. 12. Factory fabricated line sets are precharged and do not need to be evacuated. If the line set is too long or too short, see "II.G.5.a)(1) Factory Line Set Modification."

NOTICE

Ensure that there are no traps and no kinks in the line set. The service loop is not considered an oil trap.

Do not coil extra line set.

2)Connect the refrigerant lines to the appropriate male fittings on the remote condenser unit first and then at the icemaker. Make a proper connection as follows:

a.Remove the protective covers from the male fitting and female coupling.

b.Apply Polyol Ester (POE) refrigerant oil or Parker Super O Lube to the entire male fitting, including O‑ring, diaphragm, and threads before making the connection.

See Fig. 13. NOTICE! Do not use thread sealant on the fittings. Use POE refrigerant oil or Parker Super O Lube only.

c.Make sure the male fitting and female coupling are properly aligned, then start the connection by hand to ensure that it is not cross threaded.

d.Tighten the connection with a wrench until it is tight. At this point, the nut has covered most of the threads on the male fitting.

e.Mark a reference line on the female coupling and the remote condenser unit or icemaker panel. Using a backup wrench on the back of the female coupling, tighten the six-sided nut of the female coupling an additional 1/6 turn. See Fig. 14.

3)If you lengthened the line set as outlined in "II.G.5.a)(1) Factory Line Set Modification" and it exceeds 66 feet, see "II.G.4. Line Set Size and Refrigerant Charge" for proper charging of the appliance.

(1)Factory Line Set Modification

1)Recover the line set charge through the Schrader access ports on the Parker quick connect couplings and store it in an approved container. Do not discharge the refrigerant into the atmosphere. Remove the extra line set length or add extra tubing. When adding extra tubing, insulate the additional copper tubes separately.

2)Use an electronic leak detector or soap bubbles to check for leaks. Add a trace

of refrigerant to the lines through the Schrader access ports on the Parker quick connect couplings (if using an electronic leak detector), and then raise the pressure using nitrogen gas (140 PSIG). WARNING! Do not use R-404A as a mixture with pressurized air for leak testing.

26

Page 26
Image 26
Hoshizaki MWH KML-451MAH, MRH, MWH KML-631MAH aFactory Line Set Installation, 1Factory Line Set Modification