Statement 4

≥18 kg (37 lbs)

≥32 kg (70.5 lbs)

≥55 kg (121.2 lbs)

CAUTION:

Use safe practices when lifting.

7.Slide the expansion unit into the rack, and insert the M6 screws Þ Ý. Do not overtighten the M6 Þ Ý screws.

8.Tighten the rear screws Þ Ý.

9.Verify that option switches 1 and 2 (inside the switch card) are set to off (see “Setting the interface options and ID settings” on page 10 for more information).

10.Install hard disk drives and power supplies in the EXP300 expansion unit according to “Locations” on page 8; then, return here to complete the installation.

11.Continue with “Completing the installation” on page 35.

Installing the EXP300 in a Tower

The IBM® Netfinity® EXP300 Rack-to-Tower Conversion Kit converts the EXP300 storage expansion unit into a tower mounted installation. You will need a flat-blade screwdriver and a phillips screwdriver to install the EXP300. Use the mounting hardware that comes with your unit to secure it in the enclosure.

Before installing the expansion unit you must:

Netfinity EXP300 Type 3531 29

Page 37
Image 37
IBM 3531 manual Installing the EXP300 in a Tower, Statement